Two Guys Talking Ship Podcast: It's Kip from the Two Guys Talking Ship podcast and Mike from Baltimore Chesapeake Bay Shipwatchers. And guess what? We're here. We're out at the Key Bridge site. And guess what? Construction has been going on. Real construction. Real construction. It has of real piles for the real bridge. For the real bridge, yes. Not the paper mache one, though. Yes. Right, yeah. And so we we got an invitation from Jim Harkness to come out and we actually got to walk the trestle, the new trestle. I unbelievable. I like what are what are the size of those It's huge. I mean, I wasn't even thinking about okay, you know, I know they're gonna drive trucks out there, but then there's like it's not square chunks of wood that that are like curbs so like a cement truck can't just go over. Yeah, it's it's unbelievable the size of the Yeah. So we we we were able to join a couple other local social media folks here, some some Ravens cheerleaders, the Dundog News was out here today. Yep, yep. That was a hoot. Right. And Yeah, Logan was here without his red, white, and blue bathing suit. I'm not sure. I maybe somebody maybe it was in the wash. I'm not sure what happened. I don't know what happened. But we were we we took a walk and Jim and and Brad gave us a real in-depth overview of the of everything that's happening out here at the site today. And then we got on a boat and they took us out into the channel and to the other side and we we got to hear s see some of the pylons that you hear in the background right now. Right in front of us. You got to see the equipment super up close. yeah, it was it was amazing to be able to to be out there. Yeah. I mean we watch it, you know, we have the camera and people can watch from three miles away. and so like kind of what's rolling up behind us right now. seeing these things in real time and see the size of this equipment that it takes to build this stuff. I mean, just to look at this parking lot, we can't turn the camera around, but just like what did it take to put all this gravel and stone here just so people could park, just so they could do the work. Correct. You know, it's just there's just so much here. And it's amazing to be able to see it up close. Absolutely. so we we have we have some pictures, we have some video. Yeah. Jim Harkness was out on the on the boat and and giving some answering some questions for us. So we're gonna try to put all of this together in this episode so that you can see some of the sights and sounds of the key bridge being rebuilt right here on on site. So take take a look at the the the video and we'll be right back. What that is, and then we have a boat ready for you. We're gonna do a quick boat tour around the actual work that's going on on the water. This is your opportunity to ask a couple questions about what's going on, but we will be as educational as possible and letting you know what the work that's happening is going on. but before we go out there, well I guess we can just do a quick round since it's a small group, so everyone here for Maryland Transportation Authority. we've been We had a lot of work that has gotten to us to this point. We continue to be doing work and making progress, so we're excited to have you here, be able to kind of showcase that work and hopefully you guys get to see and hopefully hear and kind of experience just the magnitude of the of the project. So excited to have you all here with though. Thank you. So that way not too safe. active construction zone right before maybe you saw it but right before you guys walked out we did take a girder out to the end of the of the of the trestle that big orange piece of equipment that travel lift we are using that to run materials out to the end of the trestle so with that we will say we have a designated area a walkway area that's segregated from the rest of the trestle we're going to use that to walk out the trestle this is the south trestle and we'll Walk out almost when it's done, we'll be able to walk out all the way to the south pylon to tier twenty five, almost after the shipping channel. and we are we are as Jim will tell you here shortly, we're almost done with that. Yep. So walk out, we'll we'll take you about halfway out the trusty channel. I know way too much about ships, so if y'all have any case. crossover we'll give you a good view of the equipment we got out there first, Richard. And then we'll come back, we've got the boat waiting. We'll come back to the steel and the concrete deck overhead, and that stretched back to basically the entrance where you you came into the site. But as part of the work that we've done, as you can see we've removed the the steel, the concrete deck, the bridge feeders, we've taken those all down and removed those degrade and then now this is being used as construct contractor access For the new project. So all these vehicles here are are for folks out working on the project. they're able to park here and then be able to use this work platform, this trestle, in order to access the project. So that's one of the benefits of being able to utilize this existing infrastructure and and make use of it and then So a lot of the concrete that was on the deck that we took down, we rubelized it, we've utilized it to help stabilize the stuff that you drove in on. this part of the of the project was you know kind of placed here during the original bridge construction. So these were man-made peninsulas that were utilized as part of the former bridge construction, and then now we're utilizing it for the new bridge. So as you can see behind us, we still do have portions of the former bridge still in place. You'll see that on both sides. That was a decision that was made by MDTA in the best interest of the project. we needed to be able to remove this portion of the bridge first in order because we needed to have this work access. We also are tying in the new bridge back here. Can you get a shot of that ship when we get out there in the background? With the bridge alignment with where the former bridge was. So we had the ability to take these down at a later time when it made more sense for the schedule, for the budget. So we were able to make decisions that made the best use of our money and address the removal of these at another time. So we've we've heard a lot about questions about why is there still portions of the bridge in place? Why haven't that gone out of the way? That must be slowing things down. As you'll see when we get out there, it really isn't slowing things down because that's not where the new bridge is going. So the new bridge is going to be sort of onto the side of this this trestle, this morgue platform. So you can see that that really doesn't interfere. This existing former bridge doesn't interfere and we'll be tying in back here where where we you know drove in. So that sort of just lays some of the groundwork for you. when we start walking out here, I just also wanted to mention this wood timber that we took down, we rubilize. Stabilize the stuff that's Was you know kind of placed here during the original bridge construction. So these were man-made peninsulas that were utilized as part of the former bridge construction, and then now we're utilizing it for the new So as you can see behind us, we still do have portions of the former bridge still in place. You'll see that on both sides. That was a decision that was made by MDTA in the best interest of the project. We needed to be able to remove this portion of the bridge first in order because we needed to have this work access. We also are tying in the new bridge back here. But the new bridge, as you'll see when we get out there, is not exactly in alignment with where the former bridge was. So we had the ability to take these down at a later time when it made more sense for the schedule, for the budget. So we were able to make decisions that made the best use of our money and address the removal of these at another. time. So we've we've heard a lot about questions about Why is there still portions of the bridge in place? Why haven't that gone out of the way? That must be slowing things down. As you'll see when we get out there, it really isn't slowing things down because that's not where the new bridge is going. So the new bridge is going to be a sort of onto the side of this trestle, this ward platform. And so you can see that that really doesn't interfere. This existing former bridge doesn't interfere and will be tying in back here where where we you know drove in. So Land there. So, you know, all of that was where we started. That was the beginning of this trestle work back at the beginning of this year. So the contractor started there, obviously was able to start having to work from the water, driving all those piles. Eventually they got to where they could install some of the timber mat for the decking. Once they get that in place and they have enough advanced, then they can. large yellow crane out here. So then the crane actually starts assisting with the construction. So they work from the water, they work from the new bridge itself and just start to lengthen it. So the process there is is very similar to what's happening with the bridge where you drive the the steel pipe pile and that's about three kind of steel yep that longer one over there. okay. The channel is closer on this side. Okay. So this didn't have to be as long. So that one's 2400 feet this is 1200. Okay. And you said no crab in office, right? No crab off of here. This is a no-go zone. This is a safety zone. Okay, okay. Hey jump. Can you talk a little bit about like the dog leg layout of this trestle as compared to the straightaway layout of the other trestle? So The dog leg is a is a kind of a result of the pier protection that we have to build around the main pier and then the two other piers for the cable stay bridge. So those are so significant. That we had to dog leg it out in order to get around those. Right. So back here we have we have piers that are in the water, but they don't require the pier protection back there. So we're able to get right up along to where the pier foundation will be. But out here we have fenders that are going around those piers. So it offsets us from being able to run it straight, straight lined out there. So that's the result of the And from a layout standpoint. So the bridge will come. And then cross over this, right? And then go on the inside of it. Right. It's on the outside. It stays on the outside? All those that that kind of forest of piles is the main main span, pylon foundation, those vessel protection. Gotcha. And if you just kind of imagine that the alignment is exactly parallel with the old food. Right. It runs right next to it there. but it'll stay on the outside. okay. I thought it okay. We have a nice curve that happens and brings it back to where we wanted to. Yup, gotcha. Thank you. All right. so we could just point a few things out while we're here just to orient you to this. So again, you're gonna see that's the kind of kind of the end of the former bridge, that's where the collapse you know kind of went back to on the on the from the emergency. and then when we get out there you'll see remnants of the of the of the former bridge that collapsed. Yep. safety requirements for for the new bridge and being able to to meet all the current specifications that we have to meet for vessel safety for the new bridge. So you'll see you'll get to kind of see that distance that we've increased it as well as all the the peel the pylons and the and the piles that are going in for the protection of the peel. So you'll we'll we'll get to see all that up close. We have you know this yellow crane is working on the trestle on the north side we have a identical yellow crane working On that trestle, we have four cranes total for driving the pile out on the bridge foundations, two very large cranes and then two support cranes, so for a total of four, and you'll we'll kind of get to see that whole setup in terms of barges, tugboats, the crane barges, and everything that support all the activity that's going on. Now you can see the size of the other pieces of timber that we have that's that we're walking on. those pieces that we'll get on and this is where we just go no more than three on this on this gangway at any time. That is some serious bummer. Hey Brad, whose boat is this? This is the Lady Chesapeake from the Bay Bridge. So this is a maintenance boat that we have maintenance that is used obviously to support the Bay Bridge. Right. But they are so gracious that you know when I would I request right for a tour like this. And so the redecking is kinda done then. The where where they were cutting the pieces out and putting on two pieces at night and welding it all up and you drive over the next day. For the vapor edge. Yes, yeah, sorry. for that project. I don't know if it's done. It's done in phases and they've completed a call that I believe or Okay. Because they're doing some other stuff underneath. Absolutely. And I'm not part of too, like the welding and everything. We've got great videos about it. We've crew go out at night and capture what's going on, so at least it's really impressive how they can do that work overnight. yeah. And and then reopen for traffic in the middle. Miss Madeline, we see her on the camera all the time. One and all that. What we call the South Pylon. So this is gonna be the location of what the southernmost of the two large pylons. And those pylons, that job on the pylon is to hold up and suspend the whole cable street bridge. So that has a very important job. These foundations are critical in order to be able to build this bridge. We've got to start here, we've got to get the foundations in so that we can then build vertically. When we talk about building vertically, we're talking about 600-foot tall pilots. Right? 600 foot. It's gonna be, aside from like radio tower or some chimneys, it's gonna be the largest structure that we have the state of Maryland. Comparison will be these VGE towers you can see in the background, these large transmission towers. Those towers are less than 400 feet tall, they're about 350 feet tall. So again, So the height of the new bridge over the channel is gonna be 230 feet. We had to raise that based on our Coast Guard coordination and our requirement. So to give you an idea, how high is 230 feet above this water, the lowest point of the sag on those big cables is 230 feet. So the bottom of our bridge is gonna be that high. The original bridge was 185, something 45 feet high. Okay. And is that because of the gym situation? Safety purposes it was also anticipating future port traffic. So we anticipate that just like over the past fifty years since the original bridge was built, that marine traffic is gonna get taller. Wow. And so in order to service future bridge or vessel traffic, we needed to raise the the plate of the bridge to allow that to happen. Even stadium of the top of that superstructure is about 185. So it's about the size of the old roof. So we're gonna be four stories taller than that. the Bay Bridge. The Bay Bridge is also around up to 185 foot. It's at a similar height. Similar height. Yeah, question. So outside of just the height difference, are there any other safety things that would be in place for this bridge because of what happened? Are other things that are being applied now? Yeah, so aside from the roadway safety part that we're allowed the upgrades, you know, make changes since the 1970s when the original bridge was built. we're also increasing the width of that main stand. So we've increased that width to meet the current standards. we've also adding the vessel protection. So we've got a lot of those tiles that we see being installed today are for the vessel protection. we have 45 piles installed here at this South Pylon for the new foundation. but you have another 123 that happened to be installed just for advice protection. So we have 45 there, but a so it's a lot of piles for adjustment protection. How much of increase in like the size of the of the width? It how much increased the size it was a certain size before. Yeah. So we increased that by six hundred feet. to increase that to get to count for those vessel the new vessel size, but it also you know we couldn't get away from having protected as well. So you get to a certain height, you I mean a width and you start to run into issues with our cable stain. Can you reiterate, can you talk about like the sixteen sixty five, right? And you were talking about having a balance from from a design standpoint? Yeah. So 600 foot tall towers because we already have the 1665 in terms of this the main span this constitution. Right. So kind of in these conditions in the river with the wind conditions, the the narrowness of our our bridge deck, right? Okay we kind of have to balance the impact we work in versus what we're going for in terms of likely that a vessel will strike. So we in order to kind of find we found that balance at the distance that we have from 1665, but it also requires that we protect those ears. We have to design and it's so massive for the energies because we have such large vessels. Not only today but in the future. So we're designing for that future vessel that set the height. We're also designing that vessel you know we designed the the protection system. Right, because whatever, every fifty feet that the span increases, that means so much higher for the towers and then additional cables and additional height and just more strength for the pylon itself. Right. So you know, each of those foundation pile is also already designed to hold is that all? Yeah. And we have 45 in each in each foundation. So it's already a massive that's the basketball court. That's the inner one. it's two basketball courts. that's how big the footing is. okay. I thought it was one. Okay. Well I'm glad we talked about that. To encompass the entirety of the vessel protection for these, it is a football field. More than a football field. Right. releasing it and so I don't have the exact Two of them all site because we're working both sites simultaneously. Large pile, eight-foot diameter pile, it requires a very large hammer in order to buy that. Smaller hammers, number one, they can't get around it, or two, they just don't have enough power. And it's automatic, I would assume somebody sends it in. No, there's a whole controls, like a almost like a C container that has the brains of the unit in it, and somebody's monitoring that the whole time. We have we have a lot of instrumentation on the pile. there we also have some markings you see on the pile. where it kind of marks each bullet and so we get to watch how many times it hits and how many feet it moves when you hit. So it's called Pile Driving. This is Pile Drive. That's where the name for the rest of the location is. That's right. This is Pile Drive. This is Pile Driving. Not right now. It is a great undertaker here. You wouldn't even need to have Somebody asked, is there a night ship? Is there a night ship? We're maintaining things at the repositioning sometimes. But this park is occurring during the day. Have to be. Serious. Look what it makes me Take a picture. Take a picture of it, bitch. inside of it on the inside of it it's grooved. Right? And so the hacker on the inside on the larger part like slides up and down these grooves. Okay. Right? So it's what it hits it once every thirty or fifty seconds or something like that. I think it's kinda going back right yeah. And for a while they only have one of them out here. Yeah. That's why they're and that makes the vessel protection so it's like a two-pile rights. we we we get on it for about an hour, maybe about an hour and a half yeah. About an hour. be having a contract we have a contract advertised right now that'll be bringing that down that's part of the subcontract for Yeah, we're gonna break that down. Not we're gonna leave a a portion of it above the water, and we'll do that with the other one as well. but there are portions over there that will be This is the portion. Most of the wood still we removed, but about 10 feet up we're gonna leave. What's in the processing or something like that? Where do you start? Yeah, it's it's a lot of work. It's gonna be like the big, moving in barge to catch the material and then just hammering at it. Okay. So they'll get a large excavator that can just hammer at it. It's it's what they did on the landing position. It's just gonna be over the water now. And so you're on the water hammering the wheels. And you can try to catch the debris as they go. No, they catch the debris. Anything that doesn't, they'll they'll be able to grab it out of the out of the buckle. The ship you you guys might want to get this. Do you do you remember remember when the ship hit the bridge, the dolly, right? And remember the other A pillar landed on top of the bow. I mean do you remember seeing that? And then so part of the A-pillar was hanging off like the side of the valve and then they use like a giant diamond cutting saw and cut it and there's video of it like kerplunking into the water. So those vertical sections of the A are hollow. Which is kind of fascinating to me. Yeah you're saying right I think the top is solid but those four legs are hollow. You know steel stress you know steel cable enforced but Yeah, it's just wild the way they make stuff. Yeah, absolutely. Yeah, so you can see that the tunnel. A lot of people ask that. They're like, why didn't they just build a tunnel? So originally, in the late 60s this was planned as a tunnel. And that's part of why it has caused juice. however, the port needs to have the ability to have the They have to be able to have a route for the port in and out of port. We're not going to keep bridge that function. Additionally because we're in the ER emergency relief program that we have the federal funds. We can't do what's called a betterment and tunnel costs off. And so that would be a betterment. Like visually, is it being like is it trying to look the same as what the key bridge originally looked like or is it No, not at all. Yeah, it's you know that that's steel trussel, but it's not we're not gonna have that. Appreciate it? Yeah. Jim, thanks so much for having us out today. Amazing tour. Obviously, we're very familiar, but to see it, you know, up close and to see the size of things, to see how they built that trestle, to see how heavy duty it is. You know, it's just a temporary trestle. And from three miles away, you know, how big can it be? I know they're gonna drive trucks on it, but just amazing to see it up close and see the size of all this equipment. so thanks so much. but I do have one specific question for you. as we try to educate people and let people know about what's going on out here, there are some people who have some bridge building experience or maybe some contracting experience and they're saying things like, Well they they can't be production pile because you've gotta have this document and this has to be signed and it doesn't exist so This is all a bunch of hokum and it's not real. Can you talk about that for a minute? Sure. Yeah. Maybe dispel some of that or Yeah, I appreciate that. again, thank you guys for coming out. We really appreciate the opportunity to get you up close and personal. Right. get you out there so you can see it and and thankfully today hear the activity and the progress that's being made out on the site. Yeah advancing. I didn't notice the ringing in the background. and so I think that ringing is the installation of permanent piles for the new bridge. So those are foundation piles. we're driving the very last of the foundation piles on the north pylon. The south pylon, all 45 foundation piles are installed. By the end of the day on the north pylon, all 45 piles will be installed. Those are permanent foundation piles that's for the new bridge. Along with dozens more of the vessel protection also installed. so contractors making great progress out there, has been at it now since the beginning of the year driving that pile. That that pile is possible because of the cooperation that's been ongoing in this project since day one between USDOT, Federal Highway Administration, the state of Maryland, Maryland Transportation Authority. and and our our contractor keywit for the phase one activities. So that that funding has been secured. it was secured early on in the early days of the emergency. Right. We got we received a sixty million dollar quick release from the emergency relief program. Okay. We also have made subsequent applications to the emergency relief program to continue to fund the activities that have been out here. Not only the engineering that we've completed in 14 months, but then Also the demolition of of portions of the former bridge, all of the fabrication of that pile that you hear being installed, as well as the equipment that's installing that pile. Right. all that's possible because of the the funds that are flowing to the project from the Federal Highway Administration. We secured those funds through Congress. so Congress has made available over five hundred and seventeen million dollars for this project at this point. And that's because we've asked for it. Now they've promised that they would fund a hundred percent of this so okay that has been that was passed back in December of twenty four and so that's still active and and in effect and we've seen the release of funds since then. Okay. So I guess you led me right into another question because people are always second guessing. You know, is the money funded? Did the current president take the money away? Do we have it? Do we have to wait for it? how much More can you Yeah. This this project the Key Bridge Rebuild Project despite our off-ramp with Kiwit and and re-procuring four new contracts is still in the emergency relief program. Okay. And so we're still eligible for funds. We're still drawing down on those federal funds for the you know this project as well as the four new projects we will be doing the same. one interesting thing is as you might have heard, we did have and we were able to settle. the state of Maryland was able to settle with the with the vessel owners. Yes. And so we secured over $2 billion that will go to repay the federal government for this project. Now I'm just being a little funny. Can you just state that again? The two billion dollars that was awarded, right? That will go to fund this project. Over two billion dollars will go to fund this project. Okay. Thank you so much. All right, thank you so much Jim for your time. It was great being out here today. Thanks for having me. Three, two, one. All right. So that was that were some sights and sounds. I I Yeah. I the j just a lot of just the so you're I'm sure you're gonna hear wind blowing, yeah. And and the pile driving and us talking and all that things. Right. And how many hours did you spend editing all that? I I I yeah. I'm not looking forward to it this weekend. But no, we'll get it we'll get that we'll we'll make sure that all the editing was straight on there. Yeah, man. Yeah. a great opportunity. Yeah, fi final takeaway. What was the what was the one thing that you you know, there was a lot of things that we learned today, but what was the one thing that you took away from this? Yeah, just the immensity of the equipment, and you know, the immensity of the pieces of the trestle. Yeah. How big it is, how heavy duty it is, how every chunk of wood is like a foot square. Yeah. Just the immense size of everything. There's nothing like seeing it up close. Right. I I think for me? Yeah, for for me, I mean it was not it was great to be able to see everything from the water. You know, I've seen some shots from land or, you know, and seen the progression from land, but the to see it from water and to see them, you know, going through all of the progressions, this thing is moving forward. Right. All those pylons are in there. It's it it's just amazing the amount of effort that it takes both on both sides. Right. On both sides. So it was it was really great to see all of that. Yeah. And and we're still a working port. How many vessels were coming through the channel while we were out there? There was at least one container ship right that came through and I and I saw a saw a barge. so there I mean it's it's while it's an active construction site it's still an active commerce site. Absolutely a thousand percent yeah I mean we're actually setting port records while all this is going on. Exactly. So ri really impressive. All right, we're gonna we're gonna get this bundled up and announced to you all you all this weekend. Yeah so you can see everything that's going on. And you want to count it off? Well let's do it. The three, yeah, two, one, happy ship watching. All right, we got it in real time. Didn't have to worry about the AI to fix it. All right, everybody. Have a good