Pietro: The lowest remodeling bid isn't necessarily the wrong bid. In fact, I've recommended the lowest bid plenty of times. But before you choose a contractor based on price, there's one question you need to answer. Are these contractors actually bidding the same project? Because a $10,000 difference doesn't necessarily mean that one contractor is charging $10,000 more for the same work. I'm Pietro Merlino and this is Real Talk Remodeling with Merlino Consulting. When homeowners compare remodeling proposals, naturally one of the first things they do is look at the price. There's nothing wrong with that. Your budget matters. The problem is choosing the lowest proposal or eliminating the highest one before understanding why the numbers are different. Let's look at what I look for when comparing bids. First, I want to see the scope of work and then I start digging into the details. Let's use a bathroom for example. If we're expanding a shower and that bathroom requires cutting concrete, trenching, and rerouting sanitary lines, is that actually included? What about the work needed to put everything back together? Tile repair, drywall repair, trim, paint? Individually, some of these may not seem significant compared to the entire remodel, but they add up. If one contractor accounts for them, and the other one doesn't, those contractors aren't necessarily bidding the same project. And that can explain the difference in the price. Allowances are another area where you need to pay attention. Let's say the proposal gives you a $5 per square foot tile allowance. Does that mean you can actually choose a tile costing $5 per square foot? Maybe. But first ask what that allowance includes. If ThinSec, grout, and other materials are coming out of that same $5, that amount available for the actual tile could be considerably less. The specific numbers will vary. What's important is knowing exactly what the allowance covers before you sign. Your selection can affect labor too. Large format tile, mosaic, patterns, cabinets, vanities, and other selections may affect the work involved and ultimately the price. That's why I want those details defined as much as reasonably possible before construction starts. And this is important. Don't automatically assume a lower bid means lower quality. I had a homeowner who was actually concerned because one proposal was significantly cheaper than the others. It was for a sunroom. We had one option at about 10,600, another at around 15,000, and another at around 30,000. The homeowner was hesitant about the lowest number because he thought he might be getting an inferior product. But after comparing them, that wasn't the case. I actually thought the lower price product was As good or better than the other ones that were being offered. One of the differences was the companies themselves. The lower bidder was basically a one or two-man operation, while the higher price option came from a much larger company. So I recommended the lower price option. That's why price by itself doesn't tell you which contractor is better. I also look at how the proposal handles things that can't necessarily be confirmed before construction. For example, suppose plumbing supply lines need to be relocated. If the price assumes that those lines can be accessed through the attic, I'd like to see that assumption spelled out in the proposal. If they're actually coming through the slab and additional trenching is required, there may be an additional cost. That doesn't mean the contractor did anything wrong. Some conditions can't be confirmed until the work begins. The important thing is defining what can reasonably be defined beforehand and identifying potential additional costs when they're foreseeable. Because if you choose a $60,000 proposal over one that's $65,000, but necessary work wasn't included in the $60,000 scope, that gap can get smaller pretty quickly. Once the scope, materials, and methods are comparable, then price becomes much more meaningful. I've recommended the lower bid when I've compared the proposals and they were essentially providing the same thing. At that point, the homeowner can also consider the contractor himself. Who are you comfortable with? How well do they communicate? Do they respond? Can you see examples of their work? What do their reviews and references tell you? Reviews aren't everything, but they are another piece of information you could use. So when you get three remodeling proposals, don't immediately ask who's cheapest. And don't assume that the most expensive contractor must be the best. Zoom out, look at the scope, materials, allowances, exclusions, assumptions, and potential additional costs. Then ask are these contractors actually bidding the same project? Once you answer that question, The price starts to mean a whole lot more. And this is exactly why I created the free remodeling planning workbook. It helps you define your project before you start comparing contractor proposals, including your scope, budget, and decisions that can affect costs. Once you complete it, you can print a clean scope of work and use it as a starting point when talking with contractors. You'll also receive my free bid comparison sheet, which helps you put proposals side by side instead of just comparing the numbers at the bottom. You can find it at Merlino Consultants.com. If you're planning a remodel and want expert guidance before you sign a contract or make an expensive mistake, that's what I do at Merlino Consulting. From planning and scopes to plan sets, proposal reviews, and contractor comparisons, I help make sure you know what you're getting before the work begins. If you found value in this episode, the Buy MeACoffee link is in the description, or you can scan the QR code right on the screen. Homeowners and contractors both. Reach out at Merlino Consultants.com. Once again, it's M-E-R-L-I-N-O-C-O-N-S-U-L-T-A-N-T-S dot com. Or you could reach me through email at peter at merlinoconsultants.com. The same as a website, except you do Peter the at sign, Merlino Consultants.com. Until next time, plan smart, build well, and let's raise a standard together.